Selected Utility & Industrial Installations

Custom engineered packaged control rooms and structural platforms delivered across utility-scale and industrial environments.

Case Study 01

Power Generation

Delta, Utah

Mitsubishi IPP NOV 8 & 9 2023 KWCC Service Team

Project Classification

Hydrogen-Transition Utility Generation

Site Overview

The Intermountain Power Plant (1,900 MW) is transitioning from coal to hydrogen-capable gas turbine generation. The IPP Renewed project targets 30% hydrogen fuel at startup, with a long-term goal of 100% hydrogen utilization.

KW Custom Controls provided multi-section modular control room units supporting turbine operations within this next-generation infrastructure.

Technical Scope

Three-section modular enclosure system

Steel column-mounted structural integration

Welded installation to structural integration

Field offloading and alignment

Installation protocol implementation

Weatherstripping and environmental sealing

Multi-shift installation (Section 3 installed at 2AM)

Engineering & Field Notes

Coordination with EPC contractor (Kiewit-TIC)

Hydrogen-ready generation support

Installation sequencing across structural steel framework

On-site lessons learned documentation

Delta switchs
Intermountain Power 02
Intermountain Power 03

Case Study 02

Power Generation

Warburg, Alberta, Canada

Genessee 01

Project Classification

Repower Infrastructure & Warranty Field Support

Site Overview

Part of the “Powering Past Coal” initiative, this repower project required field service, warranty inspection, and corrective action on installed control room systems.

Technical Scope

Split section inspection

Floor plate remediation

MCC hardware replacement

Weatherstripping corrections

Structural touch-up painting

Component coordination with Mitsubishi representatives

Field investigation of panel stability

Quality Assurance Measures

ISN safety compliance

Corporate HSE coordination

On-site hazard analysis

Documentation of corrective actions

Genesee 02
Genesee 05
Genesee 06

Case Study 03

Utility Infrastructure

Austin, Texas

Jollyville 01

Project Classification

Transportable Substation Control Building

Site Overview

Modular control building fabricated off-site and delivered in two transport sections. Crane-set onto foundation piers and integrated into substation infrastructure in December 2022.

Technical Scope

Prefabricated modular enclosure

Two-truck delivery

Crane-set installation

Exterior mounted HVAC equipment

Platform and stair access integration

On-site service support and corrective detailing

Engineering Considerations

Rapid field placement

Reduced field construction time

Exterior finish correction and protective detailing

Field coordination with Warden Construction

Jollyville 04
Jollyville 02
Jollyville 03

Case Study 04

Oil & Gas

Saudi Arabia

Qurayyah & Faras Power 01

Project Classification

Utility-Scale Gas Turbine Infrastructure

Site Overview

The Qurayyah site consists of 18 gas turbines producing over 2,000 MW of generation capacity. KW Custom Controls provided structural platforms and enclosure systems integrated with GE turbine units at both Qurayyah and Faras power plants.

Technical Scope

18 Gas Turbine Units

2,000 MW installed capacity

GE Unit integration (Units #1, #8, #34)

Platform dimensions: 21'H x 20'6"W x 58'L

Integrated HVAC systems 

Structural steel platform fabrication

2,000 MW installed capacity

Engineering Considerations

Extreme desert climate conditions

Utility-scale continuous duty environment

Structural load accommodation for turbine integration

HVAC sizing for enclosure cooling under high ambient temperatures

Qurayyah & Faras Power 04
Qurayyah & Faras Power 05
Qurayyah & Faras Power 02